pre.dev/pricing is the source of truth for current prices, credit amounts, and plan features. The numbers below reflect the pricing page at the time of writing.
Plans
A few feature notes, per the pricing page:
- Pro Mode — pin the strongest model to every phase of a build — is included from the Premium plan.
- Deep Spec — the granular, subtask-level specification — is included from the Pro plan. Fast Spec is available on every plan.
- Core building blocks — architecture planning, autonomous coding and verification agents, automatic deployment and preview, GitHub automation, and data-source connections — are on every plan, including Free.
What credits pay for
Spec generation
Fast Spec: ~5–10 credits, ~1 minute.
Deep Spec: ~10–50 credits, ~3–5 minutes.
Cost scales with project complexity.
Build work
Sprints consume credits as the agent researches, codes, and verifies. Higher effort levels do more model work and cost more.
Browser agent tasks
1 credit = $0.10, billed per task with a 0.1-credit floor. Failed tasks are free.
Check your balance
Three ways, depending on where you are:In the workspace
Type
/balance in the chat composer for your remaining credits.On the web
pre.dev/projects/key shows your balance alongside your API key.
From the API
GET /credits-balance returns your remaining credits programmatically.Per-project cost analytics
The workspace tracks what each project has spent, so you can see where credits actually go — which sprints, which phases, which features. Use it to decide where auto effort is fine and where a cheaper low-effort pass would do.What happens when credits run out mid-build
Running out of credits during a sprint doesn’t lose your work:1
The build pauses safely
The agent stops at a clean point. Nothing is discarded — the code, the plan, and the sprint’s progress are all preserved.
2
You get an email
It includes the build’s current progress, screenshots of the app so far, and a link to the live preview — so you can judge how far it got without opening the workspace.
3
Top up and resume
Add credits or upgrade at pre.dev/pricing, then resume the build. It picks up where it paused.
FAQ
Do unused credits roll over?
Do unused credits roll over?
See pre.dev/pricing for the current policy on credit refills and rollover.
Which spec type should I budget for?
Which spec type should I budget for?
Fast Spec (~5–10 credits) is the default and right for most projects. Deep Spec (~10–50 credits) adds granular subtasks and is worth it for complex, production-bound builds. See Fast vs Deep.
How far do credits go on browser agents?
How far do credits go on browser agents?
At 1 credit = $0.10 with a 0.1-credit floor per task, a credit covers up to ~10 simple tasks — and failed tasks cost nothing.
I need more than the Pro plan offers.
I need more than the Pro plan offers.
The Enterprise plan has unlimited credits, the Architect API + MCP, and a dedicated solutions engineer — contact us via pricing.

